
If you buy machined parts from China and sell into the United States, duty is no longer a line you can estimate from memory. The 2026 picture is layered, classification-specific, and has changed more than once in the last eighteen months. Buyers who still price against the 2025 numbers are either leaving margin on the table or losing money on every shipment.
This is the structure, how to compute a landed cost you can defend, and the questions to put to a customs broker before you commit to a program.
Important: rates in this article are the structure as understood in late 2026 and are included for planning, not as a legal determination. Tariff rates change by notice, and they depend on your HTS classification. Have a licensed broker price your exact code before you quote a customer.
A China-origin machined part can pay up to four separate duty layers at US entry. They stack, and each keys off a different thing.
| Layer | What it keys off | Typical 2026 range |
|---|---|---|
| MFN base duty | HTS code only | 0–5% on most machined metal parts |
| Section 301 — China lists | Whether your HTS line is on List 1–3 or 4A | 25% (Lists 1–3), 7.5% (List 4A) |
| Section 301 — additional action | Goods entered after mid-2026, unless covered by Section 232 | 12.5% on many China lines |
| Section 232 — metals | Steel / aluminium / copper content and article type | 50% for articles of those metals, 25% for many derivatives |
Two structural points matter more than the individual numbers:
The layers compound on the same base. Each percentage applies to the customs value of the goods, not to the running total, so a steel part at 25% base + 25% Section 301 + 50% Section 232 pays 100% of its value in duty — before freight or fees.
Section 232 and the newer Section 301 action can exclude each other. Articles already subject to the metals action are generally outside the newer action, which is why a steel bracket and an aluminium bracket with the same shape can land at different effective rates.
Three shifts explain why old spreadsheets are wrong:
Two identical aluminium brackets can pay different duty because they classify differently. The HTS code depends on what the part is, what it does, and how complete it is — not on what it looks like.
Practical examples of the same geometry landing in different chapters:
This is why "the supplier will handle it" is a bad answer. The importer of record is legally responsible for the classification, and a supplier's DDP price built on a convenient code is a liability that arrives months later as a CBP notice.
The arithmetic is simple; the discipline is in not skipping lines.
| Line | How to calculate | Typical share |
|---|---|---|
| Goods value (FOB) | Supplier invoice | 60–75% |
| Freight | Chargeable weight × rate; air is 5–8× sea per kg | 3–10% |
| Insurance | 0.3–0.5% of CIF | ~0.5% |
| Duty | Sum of the layers above, on customs value | 10–50%+ depending on metal and code |
| Merchandise Processing Fee | Ad valorem, with min and max caps | ~0.35% |
| Harbor Maintenance Fee (sea) | ~0.125% of value | 0.1% |
| Broker / entry fee | Per entry, not per part | $100–200 per shipment |
| Inland delivery | Port to door | 1–3% |
| Working capital in transit | Value × days/365 × cost of capital | 1–3% at sea |
The last line is the one finance notices and operations forgets. Thirty-five days at sea on a $50,000 shipment is real money parked, and it is the main reason air freight is sometimes cheaper than the rate table suggests.
You cannot negotiate a tariff rate, but four levers change what you pay:
Put these to your broker in writing, and keep the answers:
That last question is not rhetorical. Under US rules, a materially false classification can attract penalties far larger than the duty saved.
Duty does not change the machining cost — it changes the multiplier on top of it. A part that is 40% cheaper at FOB can still be more expensive landed than a domestic alternative once a 50% duty stack is applied.
The practical consequence is that the China advantage is now concentrated in:
It is weakest on simple steel and aluminium parts at low value, where the percentage duty is large relative to the goods and the freight overhead is fixed.
One consequence deserves its own note because it changes how development is budgeted. A single prototype shipped by air used to arrive duty-free under the de minimis threshold. That route is closed: every shipment now needs an entry, which brings a broker fee, a bond requirement and the duty itself.
On a $400 prototype the overhead can exceed the duty. The practical responses are consolidation — waiting for several parts and shipping them together — and accepting that the sample cost is part of engineering rather than a shipping line. Neither is a reason to avoid prototyping; both are reasons not to budget prototypes at the goods value plus air freight, which is how they were modelled before 2025.
No. Duty is assessed on the customs value of the goods, which excludes international freight and insurance. A more expensive shipping route does not increase duty, and a cheaper one does not reduce it.
They can offer a DDP price, which means they absorb it. You should still know the classification and the rate, because a DDP price built on a wrong code creates a liability that can follow the goods. Ask for the HTS code in writing.
Yes, since de minimis ended. Even a low-value prototype needs an entry, and the broker fee alone can exceed the value of the part.
For goods on Lists 1–3, the 25% rate has remained in force through the four-year review. Whether your specific line is on a list is the question that matters, and only the HTS code answers it.
You may be liable for the underpaid duty plus interest and penalties, and the exposure can extend back years. This is the strongest argument for paying a broker to classify rather than letting a supplier choose a code.
Duty on a China-origin machined part is a stack: MFN, Section 301 lists, a newer 301 action, and Section 232 if it is a metal article. Each is a percentage of the same customs value, and the metals layer is usually the largest for steel and aluminium parts.
Compute the landed cost with every line, get the HTS code in writing, and re-check the rate before each program — not once a year. The sourcing side of the same decision is covered in our China sourcing guide, and the freight terms that decide who pays what are in the RFQ guide.